net2.dat
Sample model from the AMPL book
data;
param p_city := PITT ;
set D_CITY := NE SE ;
set W_CITY := BOS EWR BWI ATL MCO ;
set DW_LINKS := (NE,BOS) (NE,EWR) (NE,BWI)
(SE,EWR) (SE,BWI) (SE,ATL) (SE,MCO);
param p_supply := 450 ;
param w_demand :=
BOS 90, EWR 120, BWI 120, ATL 70, MCO 50;
param: cost capacity :=
PITT NE 2.5 250
PITT SE 3.5 250
NE BOS 1.7 100
NE EWR 0.7 100
NE BWI 1.3 100
SE EWR 1.3 100
SE BWI 0.8 100
SE ATL 0.2 100
SE MCO 2.1 100 ;